::
that’s just because its in continuous time. For example; if the rate at node one (lower) is 5% and the standard deviation of interest rates is .005 then the rate at node one (upper) is 5 * e^(2)(.005). If you are going from an upper node to a lower node then just toss a minus sign in front of the exponent term.